Prior to the inception of the FIT program, the CTP tested only pre-production design samples of armor models, which was more of a "once and done" approach. The FIT program addresses the issue of quality assurance in manufacturing after the pre-production model has performed to minimum standards set under the CTP. The FIT program assists manufacturers in identifying areas in the manufacturing process that can potentially impact the armor's performance. Through the FIT program, the CTP can identify issues and require a manufacturer to perform a root-cause analysis that makes the product better. The result is improved consistency in the manufacturing process and the quality of the armor delivered to users. The first FIT inspection occurred in September 2010. Through September 2016, inspectors contracted to the CTP completed 251 inspections at various manufacturing locations and pulled 748 total armor models. The vast majority have passed through the FIT program with no issues.
Downloads
Similar Publications
- Advancing Police-researcher Collaboration and Evidence-based Policing: an Evaluation of the Applied Criminology and Data Management Course
- Post-burn and Post-blast Rapid Detection of Trace and Bulk Energetics by 3D-printed Cone Spray Ionization Mass Spectrometry
- Assessment of analytical workflows of gunshot residue evidence and strategies for implementation of advanced technology in crime laboratories